Introduction – CONSTRUIRE https://myconstruire.com Free online reviewers and practice exams, board exam results, reviews and blogs Tue, 20 Sep 2022 04:23:12 +0000 en-US hourly 1 https://wordpress.org/?v=6.3.2 https://myconstruire.com/wp-content/uploads/2022/09/cropped-Construire-32x32.webp Introduction – CONSTRUIRE https://myconstruire.com 32 32 Duties and responsibilities of field materials man https://myconstruire.com/duties-and-responsibilities-of-a-field-materials-man/ https://myconstruire.com/duties-and-responsibilities-of-a-field-materials-man/#respond Sun, 11 Sep 2016 00:00:00 +0000 To ascertain that all materials incorporated in the work pass the requirements of the DPWH Standard and Specifications for Highways, Bridges, and airports and strictly comply with the schedule of Minimum Testing Requirements. To advise the Project Engineer on the acceptance or rejection of construction materials intended for use in the project, based on test results. Recommend the Project Engineer remedial measures for the correction of the unsatisfactory condition of materials. Prepare design mixes for concrete and bituminous mixtures. To conduct soil investigations and materials surveys for probable sources of materials, and report the approximate quantity available, suitability of materials,

The post Duties and responsibilities of field materials man appeared first on CONSTRUIRE.

]]>
  1. To ascertain that all materials incorporated in the work pass the requirements of the DPWH Standard and Specifications for Highways, Bridges, and airports and strictly comply with the schedule of Minimum Testing Requirements.
  2. To advise the Project Engineer on the acceptance or rejection of construction materials intended for use in the project, based on test results.
  3. Recommend the Project Engineer remedial measures for the correction of the unsatisfactory condition of materials.
  4. Prepare design mixes for concrete and bituminous mixtures.
  5. To conduct soil investigations and materials surveys for probable sources of materials, and report the approximate quantity available, suitability of materials, and other pertinent data.
  6. To ensure that samples are properly cured by standard procedures.
  7. To see that samples sent to Regional/District Laboratory are well packed in durable containers to avoid damages in transit and that all samples are accompanied by a sample card filled-up detail.
  8. To fully acquaint himself with the standard procedures of sampling, testing, and quality control of materials.
  9. To see that the Field Laboratory Building is constructed in accordance with the DPWH Standard and Specification.
  10. To see that the field laboratory is adequately equipped such that the progress of the work will not be impeded by laboratory testing and that non-performance of tests should not be a cause of delay in the prosecution of the work.
  11. To see that all laboratory equipment is protected from dust or foreign matters that tend to destroy their sensitivity.
  12. To see that all weighing devices and testing machines are maintained and calibrated in accordance with the DPWH Standard Specification.
  13. To have at all times the complete and up-to-date materials map of the province or city, charts, and diagrams showing the progress of work, etc. in the laboratory building.
  14. To keep a record or logbook of his daily activities ready for inspection anytime.
  15. To comply strictly with all instructions and memorandum.
  16. To submit within the required time frame test reports and other pertinent documents to the Project Implementing Office (PIO).
  17. To develop a system of filling pertinent reports on testing and quality control ready at any time for appraisal, inspection, or quality assurance audit.